Model: HX-metal stud machine
Delivery time: 30 to 45 working days
Payment: 30% T/T deposit and 70% balance before shipment
Warranty period: 2 years
Operating voltage: 380V 50Hz three-phase (customizable)
WhatsApp: +86 13512486426
E-mail: leo@hx-machinery.com
In steel framing, consistency is everything. A stud that’s slightly off can slow down assembly, create gaps, or compromise structural integrity. That’s why our metal stud machine focuses on delivering accurate profiles, hole placements, and cut lengths—every time, without variation.
Our metal stud machine combines precision roll forming with synchronized punching and cutting to produce studs that meet tight tolerances. It handles various web heights, flange widths, and material gauges, with adjustable settings that make switching between standard and custom profiles quick and repeatable. The result is a consistent product that assembles easily and performs reliably on site.
What users value most about our metal stud machine is its straightforward reliability. The controls are practical, the machine holds its settings across long runs, and the maintenance routine fits into normal shift schedules. And when support is needed—for installation, troubleshooting, or parts—our team is responsive and clear. With our metal stud machine, you get dependable output that keeps your framing projects moving, without unnecessary downtime or complications. It’s built to produce, and built to last.





Machine parameters
| No. |
Metal stud machine |
|
| 1 |
Cutting blade |
Cr12MoV, heat‑treated to HRC 58‑60 |
| 2 |
Punching & cutting
|
Hydraulic cutting |
| 3 |
Shaft diameter |
50 mm solid shaft with anti‑back‑up washer, high‑quality 45# forged steel |
| 4 |
Running speed |
0‑50 m/min without punching |
| 5 |
Forming stations |
12 stations |
| 6 |
Roller shaft material |
45# steel |
| 7 |
Forming roller |
Cr12, heat‑treated hardness HRC 58‑60 |
| 8 |
Transmission type |
Gear drive |
| 9 |
Control cabinet |
Domestic components |
| 10 |
Voltage |
380 V, 50 Hz, 3‑phase power supply |
| 11 |
Length tolerance |
±2 mm |
| 12 |
Cutting tolerance |
±1.0 mm |
| 13 |
PLC display languages |
Chinese, English, Spanish |
| 14 |
Hydraulic oil pipe |
2 pcs of 3‑meter pipe |
| 15 |
Precision counting wheel |
2 pcs |
| 16 |
Solenoid valve |
2 pcs(at least 6 extra solenoid valve plug connectors) |
| 17 |
Fuse |
2 pcs |
| 18 |
Bearing |
2 pcs |
Sales Conditions
● Payment terms: 30% deposit, 70% balance after inspection before delivery.
● Production time: Around 30 working days after receiving the 30% deposit.
● Packing method: Naked packing in a 40-foot container, securely fixed with oil rope, control cabinet and all accessories sealed.
● Warranty: 24-month limited warranty. Components and parts are free during the warranty period.
Clients Showing


